Client: BAM Building Ltd
Description: In 2012 Fireseal were appointed as the main fire-stopping contractor on this purpose built data centre. The majority of the works involved penetration sealing in floor and walls throughout the facility.
Duration: 5 months
![](http://fireseal.ie/wp-content/uploads/2017/01/Tech-Ind-Search-Engine-Data-Centre-300x176.jpeg)