Client: G&T Crampton
Description: In 2012 G&T Crampton appointed Fireseal as the main fire stopping contractor for this building which was to be upgraded in order to bring it to market.
Duration: 3 months
![](http://fireseal.ie/wp-content/uploads/2017/01/Residential-Ocean-Point-002-300x225.jpg)
Client: G&T Crampton
Description: In 2012 G&T Crampton appointed Fireseal as the main fire stopping contractor for this building which was to be upgraded in order to bring it to market.
Duration: 3 months